ENOS lifecycle CLI
Stage rings, export compliance snapshots, and diff running config.
Demo · coming soonSupport · Downloads
Find the right image for your SKU, confirm checksums before change windows, and follow staged rollout guidance aligned with global operations teams.
Match chassis, PoE budget, and software train to the product page BOM line.
Choose GA, maintenance, or hotfix rings — each with signed manifests and rollback notes.
SHA-256 checksums and optional GPG signatures; record baselines for audit.
Representative rows — production will filter by SKU, region, and entitlement.
| Product family | Version | Channel | Action | ||
|---|---|---|---|---|---|
| Campus access (EX-Access) | 7.4.2 | GA | 2026-04-18 | 248 MB | |
| Industrial hardened (ISW) | 5.1.0-hotfix-3 | Maintenance | 2026-05-02 | 196 MB | |
| Data center leaf (DC-Leaf) | 9.0.1-rc2 | Preview | 2026-05-20 | 312 MB | |
| ENOS fabric (spine/leaf) | 12.3.0 | GA | 2026-03-30 | 410 MB |
Train tags: EX-ACCESS-7.x · ISW-5.x · DC-9.x · ENOS-12.x
Stage rings, export compliance snapshots, and diff running config.
Demo · coming soonCross-platform utility for SHA-256 / GPG manifest validation.
Demo · coming soonEstimate per-port budgets before access refresh cutovers.
Demo · coming soonOpenTelemetry-aligned probe bundle for lab fabrics.
Demo · coming soonOur support engineers can map firmware trains to your BOM and confirm documentation entitlements for your organization.